Matlock Moor Wind Farm

Click here for Generation Forecast for wind farms based on Met office data

Subscribers see an interactive map with Matlock Moor Wind Farm and local projects displayed.

( Subscribe for £100 )to have full access to all Wind projects and details.


Subscribe to Wind for exact generator location including nearby generators
For an example of a wind project see: Little Cheyne Court Wind Farm


Subscribe for £500 to include full csv and KML downloads of all Wind project data.

To create a login account see: User Registration. This will allow 30 page views each session rather than 5

One subscription covers your organisation / school / university / company . NOT per user

Matlock Moor Wind Farm (Wind , Refused)

 General Information.

Location in the UK : England, DE4 5LZ    
Type of installation: Wind    on/offshore: on
Turbines :5  Capacity : 12.5 MW
Approx Date of 1st power generation:

Subscribe to Renewables Map to see: Wind Turbines make / model / hub height / elevation / latitude and longitude. Accurate data available for 99% of all Active wind farms listed, also cross reference to DECC and OFGEM datasets

Wind Turbines, Wind Farm, Renewable Energy, Green Power

/YES

 Comment

Applied 2008

West Coast Energy has urged residents to back its plan to install the five 126-metre-tall windmills, ahead of consultation events starting this wee

 Turbine Make and Specs

For Wind projects, Subscribed version includes Turbine data, average hub height, average elevation
Subscriber Register

 Address

 Associated Companies.

Relationship Company (For: Matlock Moor )
DeveloperWest Coast Energy Ltd

 DECC Data on this Project: Matlock Moor :2705

Please note that where multiple DECC rcords are available, all are shown in order. eg Project then repowering / extension, or refused project then resubmitted.

Site Name: Rushley Lodge Farm     12.5 MW
Energy Type: Wind Onshore
County: Derbyshire     Country: England     LPA: Derbyshire Dales District Council
Site ID and Reference: 2705 / A0191     District:
Applicant: Derbyshire wind Energy     Application : 09/00060/FUL (Go to search to find Application)
For Wind Farms  
Number of Turbines: 5 Turbine Capacity: 2.5
Height of Turbines: Calculated capacity: 12.5
Site Address: off Wirestone Lane, Middle Moor, Matlock, Derbyshire. DE4 5LZ
 
County: Derbyshire Region: East Midlands
OS Coordinates: 431631 / 431631
Development Status: Appeal Refused
Application Submitted: 1/26/2009 Planning Permission Granted
Application Determined: Permission refused: 7/9/2015
Construction Date:    
Generator Live This Record Last Updated: 8/6/2010
RO Banding (ROC/MWh) FiT Tariff (p/kWh):
  --- Additional Dates where relevant ----
Application Withdrawn:    
Permission Expiration Date:    
Secretary of State - Appeal Lodged:
Called In: Appeal Withdrawn:
Refusal: Appeal Refused: 4/22/2010
Granted: Appeal Granted: 7/9/2015

 OFGEM Data on this Project: Matlock Moor: Wind : -na-

 Calculations



Alternative Wind Speed: in mph Capacity: start: Optimum: / Stop: / wind: / ratio 353493

Project Info
Appeal Refusal Decision letter

Green Party: The Need For Wind Power On MATLOCK MOOR

Wind farm protesters fundraising for legal bid
RESIDENTS battling wind farm plans for a Derbyshire beauty spot are fundraising for a barrister to represent them at a public inquiry. Members of Action Against MATLOCK MOOR Windfarm Proposal (AMP) are ploughing their spare cash into a fighting fund

Calls for dialogue over wind farm
Residents have voiced concerns over the scheme's visual and health impact after the designs, for a site on MATLOCK MOOR, were unveiled on Friday.

©2018 Simon Mallett
Latest News Added
Carn Nicholas
Drone footage
Date and Time of entry: Tuesday, March 19, 2024 00:00

Carn Nicholas Solar Park
The site, developed and constructed by Innova Renewables, was energised earlier this year following the beginning of its construction in May 2022.
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dorset Green
Dorset Green H2 – South West’s first solar to green hydrogen production plant ready to produce clean, zero emission, green renewable energy
Date and Time of entry: Tuesday, March 19, 2024 00:00

Dragon LNG Meadow

Date and Time of entry: Tuesday, March 19, 2024 00:00

Pretoria rd looking towards Ellistown.Solar farm.

Date and Time of entry: Tuesday, March 19, 2024 00:00

©2017 Simon Mallett
List of solar farms in the United Kingdom
Wind farms amd turbines in the United Kingdom
Energy from waste projects in the United Kingdom
Hydro projects in the United Kingdom
Wave and Tidal projects in the United Kingdom

Comparison of Calculated and Actual Wind Farm Output

The data is currently based on:

Show same day forecast:
Show 2 day forecast:
Show 3 day forecast:
Show 4 day forecast:
 

 

 

 

 

The Lenham School